Home

This document is a cache from http://repository.lib.ncsu.edu/ir/bitstream/1840.16/5665/1/etd.pdf


ABSTRACT

Document source : repository.lib.ncsu.edu


129
IGCT1 and the eight diodes to the right of D1-D4 comprise the solid state switches for the
remaining two phases. The programmable controller sits between the data acquisition laptop
computer and the automation laptop computer.
Figure 80 Photograph of the portable power disturbance generator
B.3 Switching Stresses
Before any momentary service interruption testing began, the power disturbance generator
was tested for proper POW operation and switching stresses. These tests were conducted
using a three-phase 460V, 1780RP M, 150 hp Reliance Electric squirrel cage induction motor
as a load. Phase to phase supply voltages, phase to phase motor voltages, supply current,
IGCT voltage, IGCT current, snubber diode current, and snubber capacitor voltage are all







Summary :

Phase to phase supply voltages, phase to phase motor voltages, supply current, IGCT voltage, IGCT current, snubber diode current, and snubber capacitor voltage are all


Tags : phase,current,laptop,motor,generator,snubber,disturbance,switching,power,oltage,stresses,supply,computer





Terms    |    Link pdf-search-files.com    |    Site Map
   |    Content Removal Notice   
   |    Contact   

All books are the property of their respective owners.
Please respect the publisher and the author for their creations if their books copyrighted