2.3.2 Load and Adjust Software
2.3.3 Display Information
2.3.4 TCU Utility Programming
2.3.5 Command Software
2.3.6 Command Input and Errors
2.3.7 Special Functions
2.3.8 System Access Control
2.3.9 Alarms
2.3.10 Report Generator
2.3.11 Periodic Automatic Report
2.3.12 ACP Processing and Control Database
2.3.13 Database Definition Process
2.3.14 Historical Data Storage and Retrieval
2.3.15 Security Management
2.4 GATEHOUSE CONTROL CONSOLE (GCC)
2.5 ALARM DISPLAY IN THE GCC
2.6 SEQUENCE OF EVENTS RECORDER
2.7 ALARM PANELS AT THE GUARD BOOTHS
2.8 GUARD BOOTH AND OVERWATCH POSITION CONTROL PANELS
2.9 CCTV SYSTEM
2.10 UNINTERRUPTIBLE POWER SUPPLIES (UPS)
2.11 OVER SPEED, WRONG-WAY, AND VEHICLE PRESENCE DETECTORS
2.11.1 Photoelectric Type
2.11.2 Induction Loops
2.11.3 Radar
2.11.4 Video Detection
2.12 BALANCED MAGNETIC SWITCH (BMS)
2.12.1 BMS Subassemblies
2.12.2 Housing
2.12.3 Remote Test
2.12.4 Access/Secure
2.13 DURESS ALARMS
2.13.1 Foot-rail
2.13.2 Push-button
2.13.3 Wireless
2.14 ACTUATED TRAFFIC ARMS
2.14.1 Traffic Arm Assembly
2.14.2 Presence Detection Safety System Only
2.15 TRAFFIC SIGNALS
2.16 WARNING BEACONS
2.17 TRAFFIC SIGNAL SUPPORTS
2.18 ACTIVE VEHICLE BARRIERS
2.19 SIGNS AND PAVEMENT MARKINGS
2.20 WIRE AND CABLE
2.20.1 Above Ground Sensor Wiring
2.20.2 Direct Burial Sensor Wiring
2.20.3 Cable Construction
2.21 POWER LINE SURGE PROTECTION
2.21.1 Sensor Device Wiring and Communication Circuit Surge Protection
2.21.2 Power Line Conditioners
2.22 FACTORY ACCEPTANCE TEST
2.22.1 General
2.22.2 Test Plan
2.22.3 Test
2.22.4 Test Report
PART 3 EXECUTION
3.1 EXAMINATION
SECTION 34 41 26.00 10 Page 3
Summary :
2.3.2 Load and Adjust Software 2.3.3 Display Information 2.3.4 TCU Utility Programming 2.3.5 Command Software 2.3.6 Command Input and Errors 2.3.7 Special Functions 2.3.8 System Access Control 2.3.9 Alarms 2.3.10 Report Generator 2.3.11 Periodic Automatic Report 2.3.12 ACP Processing and Control Database 2.3.13 Database Definition Process 2.3.14 Historical Data Storage and Retrieval 2.3.15 Security Management 2.4 GATEHOUSE CONTROL CONSOLE (GCC) 2.5 ALARM DISPLAY IN THE GCC 2.6 SEQUENCE OF EVENTS RECORDER 2.7 ALARM PANELS AT THE GUARD BOOTHS 2.8 GUARD BOOTH AND OVERWATCH POSITION CONTROL PANELS 2.9 CCTV SYSTEM 2.10 UNINTERRUPTIBLE POWER SUPPLIES (UPS) 2.11 OVER SPEED, WRONG-WAY, AND VEHICLE PRESENCE DETECTORS 2.11.1 Photoelectric Type 2.11.2 Induction Loops 2.11.3 Radar 2.11.4 Video Detection 2.12 BALANCED MAGNETIC SWITCH (BMS) 2.12.1 BMS Subassemblies 2.12.2 Housing 2.12.3 Remote Test 2.12.4 Access/Secure 2.13 DURESS ALARMS 2.13.1 Foot-rail 2.13.2 Push-button 2.13.3 Wireless 2.14 ACTUATED TRAFFIC ARMS 2.14.1 Traffic Arm Assembly 2.14.2 Presence Detection Safety System Only 2.15 TRAFFIC SIGNALS 2.16 WARNING BEACONS 2.17 TRAFFIC SIGNAL SUPPORTS 2.18 ACTIVE VEHICLE BARRIERS 2.19 SIGNS AND PAVEMENT MARKINGS 2.20 WIRE AND CABLE 2.20.1 Above Ground Sensor Wiring 2.20.2 Direct Burial Sensor Wiring 2.20.3 Cable Construction 2.21 POWER LINE SURGE PROTECTION 2.21.1 Sensor Device Wiring and Communication Circuit Surge Protection 2.21.2 Power Line Conditioners 2.22 FACTORY ACCEPTANCE TEST 2.22.1 General 2.22.2 Test Plan 2.22.3 Test 2.22.4 Test Report PART 3 EXECUTION 3.1 EXAMINATION SECTION 34 41 26.00 10 Page 3
Tags :
test,traffic,control,report,system,wiring,sensor,power,guard,command,line,cable,display