3.2 INSTALLATION
3.2.1 Oversight
3.2.2 Installation Schedule
3.2.3 Wiring
3.2.4 Grounding
3.2.5 Enclosure Penetrations
3.2.6 Cold Galvanizing
3.2.7 Other Requirements
3.2.8 Incidental Infrastructure
3.3 CONTRACTOR FIELD TEST
3.4 COMMISSIONING
3.4.1 General
3.4.2 Commissioning Team Leader
3.4.3 Commissioning Team
3.4.4 Training
3.4.4.1 General Requirements
3.4.4.2 Guard's Training
3.4.4.3 Maintenance Personnel Training
3.4.4.4 System Manager Training
3.4.5 Performance Verification Test (PVT)
3.4.5.1 Test Plan
3.4.5.2 Test Equipment
3.4.5.3 Test
3.4.5.4 Test Report
3.4.5.5 Opposite Season Test
3.4.6 Endurance Test
3.4.6.1 General
3.4.6.2 Phase I Testing
3.4.6.3 Phase II Assessment
3.4.6.4 Phase III Testing
3.4.6.5 Phase IV Assessment
3.4.7 Commissioning Report
3.5 APPENDICES
-- End of Section Table of Contents --
SECTION 34 41 26.00 10 Page 4
Summary :
3.2 INSTALLATION 3.2.1 Oversight 3.2.2 Installation Schedule 3.2.3 Wiring 3.2.4 Grounding 3.2.5 Enclosure Penetrations 3.2.6 Cold Galvanizing 3.2.7 Other Requirements 3.2.8 Incidental Infrastructure 3.3 CONTRACTOR FIELD TEST 3.4 COMMISSIONING 3.4.1 General 3.4.2 Commissioning Team Leader 3.4.3 Commissioning Team 3.4.4 Training 3.4.4.1 General Requirements 3.4.4.2 Guard's Training 3.4.4.3 Maintenance Personnel Training 3.4.4.4 System Manager Training 3.4.5 Performance Verification Test (PVT) 3.4.5.1 Test Plan 3.4.5.2 Test Equipment 3.4.5.3 Test 3.4.5.4 Test Report 3.4.5.5 Opposite Season Test 3.4.6 Endurance Test 3.4.6.1 General 3.4.6.2 Phase I Testing 3.4.6.3 Phase II Assessment 3.4.6.4 Phase III Testing 3.4.6.5 Phase IV Assessment 3.4.7 Commissioning Report 3.5 APPENDICES -- End of Section Table of Contents -- SECTION 34 41 26.00 10 Page 4
Tags :
test,phase,training,commissioning,general,section,requirements,team,installation,assessment,report,testing,table