Home

This document is a cache from http://www.wbdg.org/ccb/DOD/UFGS/UFGS%2034%2041%2026.00%2010.pdf


UFGS 34 41 26.00 10 Access Control Point Control System

Document source : www.wbdg.org


paper.
c. Control diagrams and programming flow charts showing complete
control details of the active vehicle barriers, traffic signals, and
over speed and wrong way annunciation system.
d. Computers and peripherals.
e. User enrollment.
f. System start-up and shutdown procedures.
g. Use of system and application software.
h. Recovery and restart procedures.
i. Use of report generator and generation of reports.
j. Data entry.
k. Operator commands.
l. Alarm and system messages and printing formats.
m. System entry requirements.
n. Test Plan for the Performance Verification Test.
o. Test Plan for the Endurance Test.
p. Performance Verification Test Report.
q. Commissioning Report.
1.6.4.1 Active Vehicle Barrier Controls
Describe operation of barrier control modes, barrier control switches,
barrier normal and emergency operation, traffic signals, warning beacons,
vehicle presence detectors, and actuated traffic arms. Include
descriptions of security strategy for defeating a threat vehicle and the
SDDC approved barrier safety system for protecting innocent vehicles from
barrier operations.
1.6.4.2 Over-speed and Wrong-way detection
Include descriptions of the security strategy for detecting potential
threat vehicles, the coverage and operation of the sensors, and the man
machine interfaces for over-speed and wrong way alarms.
1.6.4.3 Traffic Control Plan for the Maintenance of Traffic During
Construction
Provide a Traffic Control Plan for maintenance of traffic during
construction per Section 08C of
EM 385-1-1
.
1.6.4.4 Traffic Control Plan During Active Vehicle Barrier Maintenance
Describe plans for taking one or more active barriers out of service for
maintenance or testing purposes, while other barriers at the ACP remain in
SECTION 34 41 26.00 10 Page 17







Summary :

1.6.4.1 Active Vehicle Barrier Controls Describe operation of barrier control modes, barrier control switches, barrier normal and emergency operation, traffic signals, warning beacons, vehicle presence detectors, and actuated traffic arms. 1.6.4.3 Traffic Control Plan for the Maintenance of Traffic During Construction Provide a Traffic Control Plan for maintenance of traffic during construction per Section 08C of EM 385-1-1 .


Tags : traffic,barrier,control,system,ehicle,test,plan,maintenance,actie,operation,barriers,during,report





Terms    |    Link pdf-search-files.com    |    Site Map
   |    Content Removal Notice   
   |    Contact   

All books are the property of their respective owners.
Please respect the publisher and the author for their creations if their books copyrighted