beginning of each chapter or section and at the beginning of each
appendix. The final copies delivered after completion of the endurance
test shall include modifications made during installation, checkout, and
acceptance. The number of copies of each manual to be delivered shall be
as specified on DD FORM 1423.
1.6.5.2 Final System Drawings
Maintain a separate set of drawings (including site, civil, electrical,
mechanical, structural, and architectural plans, elevations, and details),
elementary diagrams, wiring diagrams, control diagrams, and programming
flow charts of the system to be used for final system drawings. This set
shall be accurately kept up-to-date with all changes and additions to the
ACPCS and shall be delivered to the Government with the final endurance
test report. In addition to being complete and accurate, this set of
drawings shall be kept neat and shall not be used for installation
purposes. Final drawings submitted with the endurance test report shall be
finished drawings on CD-ROM in [Microstation Version 8][AutoCAD 2006][ or
more recent][_____] format.
1.7 WARRANTY
**************************************************************************
NOTE: The maintenance and service to be provided
during first year's warranty period will be included
as a separate bid item, and must be funded with O &
M funds. The designer will coordinate funding
requirements with the installation.
**************************************************************************
Provide all labor, equipment, and materials required to maintain the entire
system in an operational state as specified, for a period of two years
after formal written acceptance of the system to include scheduled and
nonscheduled adjustments.
1.8 MAINTENANCE AND SERVICE
1.8.1 Description of Work
The adjustment and repair of the system includes all vehicle barriers,
traffic arms, traffic signals, warning signals, computer equipment, CCTV
system components, sequence of events recorder, software updates,
communications transmission equipment and DTS, local processors, over speed
and wrong-way sensors, vehicle presence detection sensors, IDS sensors,
facility interface, and support equipment. All repair, calibration, and
other work shall be provided and performed in accordance with the
manufacturer's documentation and instruction. Responsibility shall be
limited to Contractor installed equipment.
1.8.2 Service Personnel
Service personnel shall be certified in the maintenance and repair of the
specific type of equipment installed and qualified to accomplish work
promptly and satisfactorily. The Government shall be advised in writing of
the name of the designated service representative, and of any change in
personnel.
SECTION 34 41 26.00 10 Page 20