UFGS 34 41 26.00 10 Access Control Point Control System

Document source : www.wbdg.org


3.4.7 Commissioning Report
Upon successful completion of the Endurance Test, the Contractor's
Commissioning Team Leader shall prepare a Commissioning Report documenting
that the Contractor has successfully completed the PVT and Endurance Test
and recommending that the completed system be accepted. The Commissioning
Report shall include signatures of the Commissioning Team.
3.5 APPENDICES
**************************************************************************
NOTE: There are 3 possible Appendix A, of which the
Designer must choose one.
**************************************************************************
SECTION 34 41 26.00 10 Page 52







Summary :

3.4.7 Commissioning Report Upon successful completion of the Endurance Test, the Contractor's Commissioning Team Leader shall prepare a Commissioning Report documenting that the Contractor has successfully completed the PVT and Endurance Test and recommending that the completed system be accepted.


Tags : commissioning,report,completed,test,endurance,team,shall,possible,leader,contractor,choose,successfully,appendix





Terms    |    Link pdf-search-files.com    |    Site Map
   |    Content Removal Notice   
   |    Contact   

All books are the property of their respective owners.
Please respect the publisher and the author for their creations if their books copyrighted