Home

This document is a cache from http://www.iea-shc.org/publications/downloads/task31-ControlDesignGuideV3.pdf


IEA Solar Heating & Cooling Programme Task 31: Daylighting ...

Document source : www.iea-shc.org


TABLE OF CONTENTS

1. INTRODUCTION
Target
audience
State of the art

2. REQUIREMENTS CONCERNING CONTROL ALGORITHMS
2.1 Integration
2.2 Priority of user preferences
2.3 User disturbances
2.4 Adaptivity
2.4.1 Adaptivity to user preferences
2.4.2 Adaptivity to boundary conditions
2.5 Sensors and redundancy
2.6 Control system reliability
2.7 Providing the optimal comfort and understanding the physiological discomfort
mechanisms
2.8 Energy considerations
2.9 Practical design of an advanced control system

3. ADVICES CONCERNING THE IMPLEMENTATION
3.1 Building management bus
3.2 Reliability and serviceabiliby
3.3 User interface
3.4 Structure of the control system

4. CONCLUSIONS AND GENERAL CONSIDERATIONS
4.1 Bio-inspiration
4.2 Adaptivity and self-commissioning
4.3 Conformance with the proposed guidelines

Appendix: PRACTICAL EXAMPLES FROM RESEARCH PROJECTS
Appendix A1: Research project DELTA
Appendix A2: Research project AdControl
Appendix A3: Research project Ecco-Build
(to be completed by other research projects !)







Summary :

CONCLUSIONS AND GENERAL CONSIDERATIONS 4.1 Bio-inspiration 4.2 Adaptivity and self-commissioning 4.3 Conformance with the proposed guidelines Appendix: PRACTICAL EXAMPLES FROM RESEARCH PROJECTS Appendix A1: Research project DELTA Appendix A2: Research project AdControl Appendix A3: Research project Ecco-Build (to be completed by other research projects !)


Tags : research,appendix,control,adaptiity,user,project,system,preferences,projects,practical,concerning,considerations,reliability





Terms    |    Link pdf-search-files.com    |    Site Map
   |    Content Removal Notice   
   |    Contact   

All books are the property of their respective owners.
Please respect the publisher and the author for their creations if their books copyrighted