Table 2-2. "GSA Standard" Credits
(Low Cost Courthouse Model)
9
Possible Points
69
Possible Points 14
Possible Points 13
Y
Prereq 1
Erosion & Sedimentation Control
Y
Prereq 1
C redit 1
1
Credit 1.1
1
C redit 2
1
Credit 1.2
1
C redit 3
1
Credit 1.3
1
C redit 4.1
1
Credit 2.1
1
C redit 4.2
1
Credit 2.2
1
C redit 4.3
1
Credit 3.1
1
C redit 4.4
1
Credit 3.2
1
C redit 5.1
1
Credit 4.1
1
C redit 5.2
1
Credit 4.2
1
C redit 6.1
1
Credit 5.1
1
C redit 6.2
1
Credit 5.2
1
C redit 7.1
1
Credit 6
1
C redit 7.2
1
Credit 7
1
C redit 8
1
5
Possible Points 15
1
Possible Points 5
Y
Prereq 1
C redit 1.1
1
Y
Prereq 2
C redit 1.2
1
Credit 1
1
C redit 2
1
1
Credit 2
1
1
C redit 3.1
1
Credit 3.1
1
C redit 3.2
1
Credit 3.2
1
Credit 4.1
1
2
Possible Points 17
Credit 4.2
1
1
Credit 4.3
1
Y
Prereq 1
Credit 4.4
1
Y
Prereq 2
Credit 5
1
Y
Prereq 3
Credit 6.1
1
1
C redit 1.1
2
1
Credit 6.2
1
C redit 1.2
2
1
Credit 7.1
1
C redit 1.3
2
1
Credit 7.2
1
C redit 1.4
2
Credit 8.1
1
C redit 1.5
2
Credit 8.2
1
C redit 2.1
1
C redit 2.2
1
1
Possible Points 5
C redit 2.3
1
1
C redit 3
1
1
Credit 1.1
1
C redit 4
1
Credit 1.2
1
C redit 5
1
Credit 1.3
1
C redit 6
1
Credit 1.4
1
Credit 2
1
9
Possible Points
69
Certified 26-32 points Silver 33-38 points Gold 39-51 points Platinum 52-69 points
Total for "GSA Standard" Credits
Total for "GSA Standard" Credits
Minimum Energy Performance
Alternative Transportation, Parking Capacity
Storage & Collection of Recyclables
Site Selection
Development Density
Brownfield Redevelopment
Building Reuse, Maintain 75% of Existing Shell
Materials & Resources
Construction Waste Management, Divert 50%
Sustainable Sites
Alternative Transportation, Public Transportation Access
Stormwater Management, Treatment
Light Pollution Reduction
Landscape & Exterior Design to Reduce Heat Islands, Non-Roof
Optimize Energy Performance, 50% New / 40% Existing
Measurement & Verification
Renewable Energy, 20%
Green Power
Additional Commissioning
Ozone Depletion
Landscape & Exterior Design to Reduce Heat Islands, Roof
Alternative Transportation, Alternative Fuel Refueling Stations
Water Use Reduction, 30% Reduction
Alternative Transportation, Bicycle Storage & Changing Rooms
Construction Waste Management, Divert 75%
Resource Reuse, Specify 5%
Building Reuse, Maintain 100% of Existing Shell
Building Reuse, Maintain 100% Shell & 50% Non-Shell
Renewable Energy, 10%
Optimize Energy Performance, 60% New / 50% Existing
Renewable Energy, 5%
Controllability of Systems, Perimeter
CFC Reduction in HVAC&R Equipment
Optimize Energy Performance, 20% New / 10% Existing
Optimize Energy Performance, 40% New / 30% Existing
Optimize Energy Performance, 30% New / 20% Existing
Innovation & Design Process
Daylight & Views, Views for 90% of Spaces
Innovation in Design: Dedicated Ventilation System
Controllability of Systems, Non-Perimeter
Thermal Comfort, Comply with ASHRAE 55-1992
Thermal Comfort, Permanent Monitoring System
Daylight & Views, Daylight 75% of Spaces
Low-Emitting Materials, Composite Wood
Water Efficient Landscaping, Reduce by 50%
Water Efficient Landscaping, No Potable Use or No Irrigation
Innovative Wastewater Technologies
Water Use Reduction, 20% Reduction
Carbon Dioxide (CO
2
) Monitoring
Ventilation Effectiveness
Low-Emitting Materials, Adhesives & Sealants
Fundamental Building Systems Commissioning
Low-Emitting Materials, Carpet
Innovation in Design
LEEDTM Accredited Professional
Innovation in Design
Innovation in Design
Indoor Chemical & Pollutant Source Control
Stormwater Management, Rate and Quantity
Low-Emitting Materials, Paints
Minimum IAQ Performance
Environmental Tobacco Smoke (ETS) Control
Water Efficiency
Energy & Atmosphere
Indoor Environmental Quality
Construction IAQ Management Plan, During Construction
Construction IAQ Management Plan, Before Occupancy
Resource Reuse, Specify 10%
Reduced Site Disturbance, Protect or Restore Open Space
Rapidly Renewable Materials
Certified Wood
Recycled Content, Specify 5% PC + PI
Recycled Content, Specify 10% PC + PI
Local/Regional Materials, 20% Manufactured Locally
Local/Regional Materials, of 20% Above, 50% Harvested Locally
Reduced Site Disturbance, Development Footprint
Note: Credits outlined in Red are considered "High Design Impact" credits.
Cost Key
Measures not applicable to the project
Measures unlikely to be pursued on typical GSA projects
Measures with high cost premiums (>150K for Models from GSA LEED Cost Study)
Measures that are met based on GSA standards or mandates (no premium)
Measures with no cost premiums, or with potential cost decreases
Measures with low cost premiums (<50K for Models from GSA LEED Cost Study)
Measures with moderate cost premiums (between 50K - 150K for Models from GSA LEED Cost Study)
GSA LEED APPLICATIONS GUIDE
14