LattisLink 2800A 10BASE-T Workgroup Concentrator User’s Guide
Document source : www.retrocomputing.net
Rack Installation
893-541-A
2-5
Figure 2-3. Connecting Power Cord
4.
Turn on the power switch.
5.
Check the Power LED on the front panel (see Figure 2-4). If it does
not light, contact the customer support depart-ment of the
organization from which you purchased your Model 2800A.
Figure 2-4. Power LED
At this point the concentrator is ready to have the network cables connected.
See Chapter 3 for information on network configurations and connecting
cables.
Rack Installation
To install the Model 2800A in an equipment rack, follow these steps:
1.
Attach mounting brackets:
MDI-X/MDI
AUI Port
AUI
Partition
Power
Data <Data>
Col
Power LED
Summary :
Check the Power LED on the front panel (see Figure 2-4). Power LED At this point the concentrator is ready to have the network cables connected.
Tags :
power,rack,figure,led,2800a,see,installation,aui,model,network,cables,connecting,893541a