Home

This document is a cache from http://www.retrocomputing.net/parts/s/synoptics/2813/docs/893541A.PDF


LattisLink 2800A 10BASE-T Workgroup Concentrator User’s Guide

Document source : www.retrocomputing.net


Installation
2-12
893-541-A
Figure 2-12. Connecting Power Cord
5.
Turn on the power switch.
6.
Check the Power LED on the front panel (see Figure 2-13). If it does
not light, contact the customer support depart-ment of the
organization from which you purchased your Model 2800A.
Figure 2-13. Power LED
At this point the concentrator is ready to have the network cables connected.
See Chapter 3 for information on network configurations and connecting
cables.
S
MDI-X/MDI
AUI Port
AUI
Partition
Power
Data <Data>
Col
Power LED







Summary :

Power LED At this point the concentrator is ready to have the network cables connected.


Tags : power,figure,led,212,see,aui,network,cables,213,connecting,cord,organization,893541a





Terms    |    Link pdf-search-files.com    |    Site Map
   |    Content Removal Notice   
   |    Contact   

All books are the property of their respective owners.
Please respect the publisher and the author for their creations if their books copyrighted