Home

This document is a cache from http://cefarhangi.iust.ac.ir/download/courses/softwareengineering/E-Books/Ebook/John.Wiley.and.Sons.Dynamic.Enterprise.Architecture.How.%20(1).pdf


Dynamic enterprise architecture

Document source : cefarhangi.iust.ac.ir


The project-start architecture ensures that the final result delivered
by the project fits into the information systems as a whole. Also, be-
cause management and flexibility requirements are considered, the
project-start architecture ensures that the entire life cycle of the appli-
cation is taken into account during the development of the IT solution.
146
Dynamic Enterprise Architecture
Project-start
Architecture
1. Environment model
2. Scope of the IT solution
3. Design choices
4. Standards and
guidelines
The project-start architecture, if properly applied, also has a posi-
tive effect on the speed of development. The project team can con-
centrate all its energy on creating the solution. Using a project-start
architecture has the following advantages:
· Time-consuming discussions about the tools to be used and the
required techniques are unnecessary. As time passes, the experi-
ence in using standard tools and techniques will increase. The
project team can focus its attention on the objective instead of
on the means. This facilitates a rapid start of the project.
· Additionally, many choices have already been made in the
project-start architecture, making it clear right from the start
which competencies are needed. This makes it possible to find
the right people for the project.
· Another aspect of the project-start architecture that can mean a
considerable acceleration is that the project team does not lose
a disproportionate amount of time holding coordinating ses-
c07_wagter.qxd 12/10/04 12:27 PM Page 146







Summary :

The project-start architecture ensures that the final result delivered by the project fits into the information systems as a whole. · Another aspect of the project-start architecture that can mean a considerable acceleration is that the project team does not lose a disproportionate amount of time holding coordinating ses- c07_wagter.qxd 12/10/04 12:27 PM Page 146


Tags : architecture,projectstart,project,team,solution,start,choices,tools,time,146,right,techniques,ensures





Terms    |    Link pdf-search-files.com    |    Site Map
   |    Content Removal Notice   
   |    Contact   

All books are the property of their respective owners.
Please respect the publisher and the author for their creations if their books copyrighted